The pool, the buildings, the terraces, the planting, the lighting and the drainage, drawn as one plan. One firm builds all of it, on one schedule, and answers for all of it.

Aerial view of the whole estate: the drive and motor court, the house, and the pool and gardens behind — Château de Rêve, Great Falls, Virginia
Château de Rêve · Great Falls, Virginia

What we build

One plan for the whole property

Grading and drainage design, engineered by our civil partners

Hardscape & softscape

Landscape lighting design

Irrigation & smart controls

Complex sites are our specialty. Steep lots, poor soil, tight setbacks — we engineer the way through on paper before we build.

A masterplan for a Potomac residence: the house, terraces, paths and planting drawn as one site plan before anything is built
From above: the drive running between lawns and clipped hedges to the house and its gardens — Château de Rêve, Great Falls, Virginia
An aluminum louvered pergola over a dining and lounge terrace beside the pool — Willowsford Modern, Aldie, Virginia

How a project runs

Our lead designer walks the property with you. We draw it and price it as we go, while the engineering and permits move along at the same time. Then we build what was drawn, with a superintendent assigned to your project, on site at every key stage, and regular updates with photos.

See the full process

Frequently asked questions

What is included in a complete outdoor estate project?

A complete estate project integrates every element of the outdoor environment into a unified design: pool and spa, outdoor kitchen, pavilion or pool house, hardscape (patios, walkways, retaining walls), softscape (planting design), landscape lighting, drainage engineering, and irrigation systems. One firm manages the entire scope — one timeline, one point of accountability.

How long does a whole-property project take?

A patio, planting or a pergola: about a week of design, then one to two months to build. A pool or a whole property: two to four months of design and permits, then two to four months of construction, sometimes longer. Design, engineering, permits and ordering run in parallel, so nothing waits on anything else.

Can you coordinate with our architect?

Yes. We regularly work with architects, including James McDonald Associate Architects. Early coordination allows us to align outdoor site planning with the home's architecture, stub out utilities during home construction, and ensure material palettes are cohesive. Builder coordination during concurrent construction can save weeks and significant cost.

How do you handle permitting for multi-element estate projects?

Multi-element projects often require overlapping permits — pool, structures, grading, gas, electrical — across the same jurisdiction. We manage the full permitting package as a coordinated submittal to avoid sequential delays. In Fairfax County, this means a comprehensive Tier 3 site plan. In Loudoun County, building, zoning, and grading permits may all apply. HOA review is coordinated in parallel.

How is a whole-property project priced?

We price it as we design it. The cost depends on the number of elements, the site and the materials, and you see it change with each decision, so nothing about the budget is a surprise once construction starts.

What our clients say

“Everything was delivered to spec, it was delivered on time, it was delivered in budget.”
The Raspberry Falls Estate · Leesburg, Virginia
Watch the full conversation

Tell us about your home.

Request a Site VisitSee how it works

Your first visit is complimentary.

Or call 703.771.1003

A real person answers your call, day or evening. We’ll set up a first conversation and a walk of your property with our lead designer.